• 0 Posts
  • 20 Comments
Joined 2 years ago
cake
Cake day: August 15th, 2023

help-circle



  • Funny thing is, I’ve relocated DCs too and we did the opposite. We had rolling racks and we wrapped the entire rack with everything still in it and did a padded wrap with anti-tip indicators.

    The biggest thing to watch out for was we used a temperature controlled truck to ensure there wasn’t a swing in humidity or temps to cause condensation and then let the racks sit in the new locations for 24 hours before power on

    Moving 85 racks with literally hundreds of disks and we only lost 4 disks over the next 6 months which was in line with our normal failure rate. No need to tear down and re-rack.